What is SDLC?
The Software Development Life Cycle (SDLC) is a structured, step-by-step process used to plan, analyse, design, build, test, deploy and maintain software (or an information system). It defines what must be done at each stage, who does it and what output each stage produces.
Importance of SDLC
- Gives a clear plan, goals and deliverables for each phase.
- Helps deliver software that meets user requirements.
- Controls cost and time – estimates are made early.
- Finds errors early, when they are cheaper to fix.
- Improves quality through systematic testing.
- Improves communication between customers, managers and developers.
- Produces documentation that helps future maintenance.
- Reduces risk of project failure.
Phases of SDLC
1 Planning ─► 2 Analysis ─► 3 Design ─► 4 Development (Coding)
│
7 Maintenance ◄─ 6 Deployment ◄─ 5 Testing ◄────┘
└──────────── feedback for the next cycle ───────┘
1. Planning (preliminary investigation / feasibility study)
- Identify the problem or opportunity and the scope of the project.
- Feasibility study – is the project worth doing?
- Technical feasibility – do we have the technology and skills?
- Economic feasibility – will benefits exceed costs (cost–benefit analysis)?
- Operational feasibility – will users accept and use it?
- Schedule feasibility – can it be finished on time?
- Legal feasibility – does it follow laws and regulations?
- Output: project plan, budget, schedule, feasibility report.
2. System analysis (requirements analysis)
- Study the current system and gather user requirements using interviews, questionnaires, observation and document review.
- Define functional requirements (what the system must do – e.g. "issue a fee challan") and non-functional requirements (performance, security, usability).
- Output: SRS – Software Requirements Specification document.
3. System design
- Decide how the system will work.
- Logical/high-level design: overall architecture, modules, data flow diagrams (DFD), ER diagrams.
- Physical/detailed design: database tables, user-interface screens, input forms, reports, algorithms, hardware/network needs.
- Output: design document (blueprint for programmers).
4. Development (coding / implementation)
- Programmers write the code in a chosen programming language according to the design.
- Database is created; modules are integrated.
- Output: working software (source code + executable).
5. Testing
- Check that the software works correctly and meets requirements; find and fix bugs.
- Unit testing – individual modules.
- Integration testing – modules working together.
- System testing – the complete system.
- Acceptance testing (UAT) – real users confirm it meets their needs. Alpha testing at the developer's site, beta testing by selected users in the real environment.
- Output: tested, approved software and test reports.
6. Deployment (installation / implementation)
- Install the system at the user site, convert old data, train users and provide manuals.
- Changeover (conversion) methods:
- Direct (plunge) – old system stopped, new one starts immediately (risky, cheap).
- Parallel – old and new run together for a while (safe, costly).
- Pilot – new system used first in one department/branch.
- Phased – introduced module by module.
7. Maintenance
- Keep the system running after delivery:
- Corrective – fix bugs found later.
- Adaptive – adapt to new OS, hardware or laws.
- Perfective – add features, improve performance.
- Preventive – make changes to prevent future problems.
- Maintenance continues for the life of the software; major changes start a new cycle.
Personnel involved in SDLC
| Person | Role |
|---|---|
| Project Manager | Plans the project, sets schedule and budget, assigns tasks, monitors progress, manages risks and communicates with stakeholders. Responsible for delivering on time and within budget. |
| System Analyst | The bridge between users and developers: studies the existing system, gathers requirements, prepares the SRS, and designs the solution (DFDs, specifications). |
| Programmer (Software Developer) | Writes, debugs and documents program code according to the design; fixes errors found in testing. |
| Software Tester (QA Engineer) | Designs test cases, tests the software, reports bugs and verifies fixes; ensures quality. |
| Customer / End User | Provides requirements, reviews designs, participates in acceptance testing, and finally uses the system; gives feedback. |
Others: database administrator, UI/UX designer, network administrator, technical writer, trainer.
SDLC models (approaches)
| Model | Idea | Suitable when |
|---|---|---|
| Waterfall | Phases in strict sequence; each completes before the next begins | Requirements are clear and fixed |
| Prototyping | A quick working model is built and refined with user feedback | Requirements are unclear |
| Spiral | Repeated cycles with risk analysis in each loop | Large, high-risk projects |
| Incremental / Iterative | System built in small parts (increments) | Early delivery of core features |
| Agile (Scrum) | Short iterations (sprints of 1–4 weeks), continuous customer feedback, working software delivered frequently | Changing requirements, modern apps |
| V-Model | Each development phase has a matching testing phase | Safety-critical systems |
Software Development Life Cycle: Explained (AltexSoft)
Software Engineering – Crash Course Computer Science #16
Short and long questions
1. What is SDLC? Explain its importance and any two SDLC models.
Model answer
SDLC is a systematic, phased process (planning, analysis, design, development, testing, deployment, maintenance) for building software. Importance: gives a clear roadmap and deliverables; ensures requirements are met; controls cost and schedule; detects errors early; improves quality, documentation and communication; reduces risk. Waterfall model: phases follow one another in sequence; simple and easy to manage; good for fixed requirements; difficult to accommodate changes. Agile model: development in short sprints with continuous customer involvement; working software delivered frequently; adapts easily to changing requirements; needs close teamwork.
2. Write any four advantages (importance) of SDLC.
Model answer
(1) Clear planning and goals for each phase; (2) better control of cost and time; (3) early detection of errors and higher quality; (4) better communication and documentation; (5) reduced project risk.
3. Define SDLC.
Model answer
The Software Development Life Cycle is a structured process consisting of phases — planning, analysis, design, development, testing, deployment and maintenance — used to develop high-quality software that meets user requirements within time and budget.
4. Explain the phases of SDLC in detail.
Model answer
1. Planning: identify the problem and scope; conduct a feasibility study (technical, economic, operational, schedule, legal); prepare budget and schedule. 2. Analysis: study the current system; gather requirements through interviews, questionnaires and observation; define functional and non-functional requirements; produce the SRS. 3. Design: plan how the system will work – architecture, modules, DFDs, database tables, user interfaces, reports and algorithms; produce the design document. 4. Development: programmers write and integrate code, create the database and fix errors. 5. Testing: unit, integration, system and acceptance (alpha/beta) testing to find and remove bugs and confirm requirements are met. 6. Deployment: install the system, convert data, train users, provide manuals; changeover methods – direct, parallel, pilot, phased. 7. Maintenance: corrective, adaptive, perfective and preventive maintenance throughout the system's life; major changes begin a new cycle.
5. What are the types of maintenance?
Model answer
Corrective (fix bugs), adaptive (adjust to new environment), perfective (add features/improve performance) and preventive (prevent future problems).
6. Name the four levels of testing.
Model answer
Unit testing, integration testing, system testing and acceptance testing (alpha and beta).
7. What is a feasibility study? Name its types.
Model answer
A feasibility study checks whether a proposed system is practical and worth developing. Types: technical, economic (cost–benefit), operational, schedule and legal feasibility.
8. Describe the personnel involved in SDLC and their responsibilities.
Model answer
Project manager: plans the project, sets budget and schedule, assigns tasks, monitors progress, manages risk and communicates with stakeholders. System analyst: investigates the current system, collects requirements, prepares the SRS, designs the system and links users with developers. Programmer: writes, tests (debugs) and documents code according to the design; fixes reported bugs. Software tester: prepares test plans and cases, performs testing at different levels, reports defects and ensures quality. Customer/end user: provides requirements, reviews prototypes/designs, performs acceptance testing, uses the system and gives feedback. Other roles may include database administrator, UI/UX designer and trainer.
9. What is the role of a software tester?
Model answer
A tester designs and runs test cases, finds and reports bugs, verifies that fixes work and ensures the software meets requirements and quality standards.
10. What is the role of a system analyst?
Model answer
A system analyst studies the existing system, gathers and documents user requirements (SRS), designs the new system's logic and acts as a link between users/management and programmers.
11. What is the waterfall model?
Model answer
The waterfall model is a linear SDLC model in which phases are performed in strict sequence — each phase is completed and approved before the next begins. It is simple but inflexible to changes.
This lesson ends with a quiz of 27 MCQs. Open the lesson on PrepOasis to take it and save your progress.
Previous: Week 5 Lab 5 – MS Word: Interface, Documents, Editing Text, Page Borders and Table of Contents · Next: Week 6 Lab 6 – MS Word: Symbols, Equations, Font, Paragraph and Page Formatting, Find & Replace
All lessons in Application of ICT (GEN-103) – BS 1st Semester